You’ve finally made up your mind—it’s time to renovate your home. Whether you’ve been dreaming of a modern kitchen, a luxurious bathroom, or a complete overhaul of your apartment, one question inevitably comes up: How long will the renovation take? This question is crucial because it affects your daily routine, budget, and even your living arrangements during the renovation process.

In this comprehensive guide, we’ll explore the factors that influence the timeline of a renovation project, discuss common delays, and provide you with an estimated timeframe for different types of renovations. We’ll also offer tips on how to minimize delays and ensure your renovation project runs as smoothly as possible.

Why Renovation Timelines Vary

No two renovation projects are alike. The time required to complete a renovation depends on several variables, including the size and scope of the project, the rooms being renovated, the complexity of the work, and even external factors like the availability of materials or the speed of local authorities in processing permits.

It’s important to remember that renovations are dynamic projects. What begins as a simple flooring change may uncover hidden electrical issues, or that kitchen upgrade might require plumbing changes that weren’t anticipated. Therefore, while it’s helpful to have an estimated timeframe, flexibility is key.

Key Factors That Affect Renovation Duration

Here are some of the major factors that play a role in determining how long your renovation will take:

1. Size and Scope of the Project

The scale of your renovation is the number one determinant of how long it will take. For example:

  • Complete home renovation: A full makeover of a 90–100 square meter apartment can take anywhere from 4 to 6 months, especially if it involves altering the structure, replacing installations, or modifying room layouts.
  • Partial renovations: Updating just a kitchen or bathroom will typically take far less time—sometimes just a few weeks.

The more extensive the project, the longer the timeline. Structural changes, such as moving walls or changing room configurations, will naturally require more time than surface-level upgrades like repainting or replacing furniture.

Pro Tip: Looking for a trusted home renovation company in Southington, CT? We specialize in full-home remodels, upgrades, and custom renovations. Get your free consultation today!

2. Type of Rooms Being Renovated

Some rooms take longer to renovate than others due to the complexity of their plumbing and electrical systems.

  • Kitchen: A simple cosmetic upgrade—changing cabinets and countertops—may take 1 to 2 weeks. However, if plumbing or electrical systems need to be updated, it could take up to 2 months.
  • Bathroom: A bathroom without fixture updates can be done in 7 to 10 days, but if the project involves replacing the tub, toilet, or retiling, expect 2 to 3 weeks at minimum.
  • Living room or bedroom: These typically require less time, especially if there are no plumbing or structural elements involved.

3. Extent of Interior Work

What you plan to change inside the space makes a huge difference in how long the job takes. The more elements you touch, the more time it will take:

  • Surface-level upgrades: Repainting walls, changing light fixtures, or replacing furniture can often be completed in a matter of days.
  • Deep renovations: Projects that involve breaking down walls, rewiring electrical systems, or redoing plumbing will require several weeks or even months.

4. Size of the Property

A small apartment will naturally take less time to renovate than a large home or villa. A 50 square meter studio may be fully renovated in 1 to 2 months, while a 200 square meter home could take 6 to 8 months depending on the complexity.

5. Materials and Custom Orders

Materials can make or break your renovation timeline. Some materials—especially luxury or imported ones—may take weeks or even months to arrive. This includes:

  • Custom cabinetry
  • Imported tiles or flooring
  • Specialty lighting or plumbing fixtures

If these materials are ordered late, or if suppliers face shipping delays (common during holiday seasons or global events), the whole project can stall.

6. Permits and Legal Requirements

In many regions, you must apply for permits before starting major renovations—especially when structural changes or utility updates are involved. Unfortunately, these approvals can take time.

The timeline for obtaining permits depends heavily on your local municipality. Some cities process permits within days, while others can take several weeks or even months. Always include this time in your renovation schedule.

Common Drawbacks That Can Delay Renovation Projects

Even with the best planning, unexpected issues can arise during a renovation. Here are some common setbacks that can impact your timeline:

1. Permit Delays

As mentioned earlier, waiting for municipal approvals is often out of your control. If paperwork is incomplete or if the city is backed up with applications, your renovation may be on hold for weeks.

2. Supply Chain Issues

Post-pandemic logistics and shipping delays have become a significant issue for home improvement projects. Items that used to arrive in a few days may now take weeks or even months, especially if they’re sourced from abroad.

3. Unforeseen Structural Problems

Once walls are opened and floors are pulled up, you may uncover hidden problems like:

  • Mold or water damage
  • Outdated or unsafe electrical wiring
  • Damaged or corroded pipes

These issues need to be fixed before proceeding and can add unexpected days or weeks to your timeline.

4. Labor Shortages

Good contractors are in high demand. If your renovation crew is juggling multiple projects or facing labor shortages, you may experience delays due to limited manpower.

Estimated Timeframes for Common Renovations

While each renovation project is unique, here are some general estimates to help you plan better:

Full Home Renovation (90–100 sqm)

  • Timeline: 4 to 6 months
  • Includes: Plumbing, wiring, structural changes, flooring, painting, and full room remodels.

Kitchen Renovation

  • Simple renovation (furniture replacement only): 7 to 10 days
  • Full renovation (plumbing, electrical, tiling, cabinets): 1 to 2 months

Bathroom Renovation

  • Basic upgrade: 1 week to 10 days
  • Full remodel (fixtures, tiling, plumbing): 2 to 3 weeks

Bedroom or Living Room Update

  • Timeline: 5 days to 3 weeks
  • Includes: Painting, furniture, lighting, and flooring.

Outdoor Spaces (Terrace, Garden)

  • Timeline: 2 to 4 weeks depending on landscaping and structural work

How to Plan a Renovation Effectively

The most important ingredient for a successful and timely renovation is proper planning. Here are some practical tips to help you manage your renovation project more efficiently:

Define Your Scope Clearly

Before any work begins, define what you want to accomplish. Are you just replacing tiles or completely changing the layout? Clear goals will help avoid mid-project changes that delay completion.

Choose Materials Early

Finalize your materials, fixtures, and finishes well before construction begins. This ensures everything arrives on time and matches your expectations.

Hire Reputable Contractors

Experienced contractors help avoid costly mistakes and delays. Always check references and sign a clear contract that outlines the scope of work, payment schedules, and timelines.

Get Permits in Advance

If your renovation requires permits, apply for them as soon as possible. Work closely with professionals who are familiar with local building codes to avoid surprises.

Prepare for the Unexpected

Build extra time into your renovation schedule. A 10–15% buffer will help you absorb minor delays without derailing the entire project.


Conclusion: Patience Pays Of

Renovating a home is exciting—but it’s also a complex project that requires time, planning, and flexibility. The question “how long does a renovation take?” doesn’t have a one-size-fits-all answer, but with the right planning and realistic expectations, your renovation can be completed with minimal stress.

Whether you’re renovating a kitchen, upgrading a bathroom, or giving your entire home a fresh start, always work with professionals you trust. And remember: great results take time.

At Miguel’s General Construction, we take care of every detail for you—from initial design consultation to final touches. We’ll help you plan your renovation down to the smallest element, handle permits, order materials, and deliver the space you’ve always dreamed of. Contact us today and take the first step toward transforming your home!